Skip to content

Bespoke playground design and construction

Bespoke playground design and construction: our professional selection

When no catalogue model fits the site, the playground is drawn rather than selected. Bespoke projects such as Eco-Marina, Adventure Constellation, Adventure Crossing and the Galaxy Configuration show what modular construction in armoured rope allows: linear routes along a riverbank, themed sets for a marina, and modular parks designed to grow. Around thirty published examples serve as a starting point for discussion, not as a limit.

The framework behind our playgrounds and trails

Standards appliedEN 1176:2015 for playground equipment, EN 16630:2015 for permanently installed outdoor fitness, EN 1177 for impact-attenuating surfacing
CertificationRanges tested and certified by an independent body, TÜV Rheinland on the TRAINER ranges — certificate supplied on request
Data published per referenceAge range, free fall height, safety zone, foundation depth and overall dimensions
MaterialsHot-dip galvanised and powder-coated steel, stainless steel, HPL and HDPE panels, laminated timber, braided polyamide ropes
Impact-attenuating surfacingSized from the equipment free fall height, never from its product family
Structural warranty20 years on steel structures, lifetime on stainless structures manufactured by Light In Fitness
Spare partsAvailable for at least 20 years after delivery
Statutory inspectionsDownloadable inspection log, compliant with French decree 96-1136 for public play areas
Design and manufacturingStructures designed in Tours, France and manufactured in Europe — priced quotation within 72 hours

Showing all 30 resultsSorted by latest

How a bespoke project runs

The process starts from your plot, your theme and your budget, in that order. The plot decides what geometry is possible; the theme decides how the modules are dressed; the budget decides how much of the scheme is built in the first phase. The output is a layout compliant with EN 1176, with impact attenuating surfacing specified to EN 1177 from the free heights of fall of the design. Phasing is planned at this stage so that foundations and surfacing are laid once.

Who commissions bespoke playgrounds

Local authorities with a site that has an awkward shape or a strong identity, marinas and riverside developments, holiday villages, and leisure operators who want an installation that cannot be found elsewhere. Light In Fitness has worked with these clients from Tours, France, since 2013, and installation is carried out across France.

Stage What is produced
Brief Plot dimensions, users served, theme and budget envelope
Concept Module arrangement and circulation on your plan
Compliance EN 1176 layout, safety zones and EN 1177 surfacing schedule
Quotation Equipment, surfacing and installation, phased if required
Installation Works in France, with handover documentation

Frequently asked questions

Is there a minimum project size?

Bespoke work is normally justified from the point where several modules and a themed layout are involved. Smaller sites are usually better served by catalogue modules.

Can a bespoke scheme be built in phases?

Yes, provided phasing is decided at the concept stage so groundworks and surfacing are not repeated.

How do I start?

Send the plot plan and your intentions; a first response is issued within 24 working hours.

Request a quotation

TOP
My quotation request 0