https://lightinfitness.com/realisations/ https://lightinfitness.com/realisations/ en_US Case Studies | Light In FitnessDocumented sports equipment projects: municipal outdoor flooring, Ninja Warrior rigs, army street workout rigs and international installations in 14 countries.
Light In Fitness
  • Strength training
    • Selectorised
      • Strength training
      • Selectorised
      • Forza FH
      • Gold Line
      • Lexco
      • Bodytone SRX
      • Power Line
      • Authentique range
    • Plate loaded
      • Plate loaded
      • Etenon Olympic
      • Solid Rock
      • TITAN range
    • Benches
      • Benches
      • Racks and cages
      • Barbells
      • Multi station gyms
    • Accessories
      • Accessories
      • Kettlebells
  • Cardio equipment
    • Treadmills
      • Cardio equipment
      • Treadmills
    • Exercise bikes
      • Exercise bikes
      • Cycling bikes
    • Cardio machines
      • Cardio machines
      • Cross trainers
      • Rowers
      • Ski ergometers
      • Xebex
  • Wellness
    • Cold plunge baths
      • Wellness
      • Cold plunge baths
      • Portable baths
      • Fixed baths
      • Chillers
    • Pilates
      • Pilates
  • CrossFit and Hyrox
    • CrossFit rigs
      • CrossFit and Hyrox
      • CrossFit rigs
    • Ziva
      • Ziva
      • Container gym
    • Standards
      • Standards
  • Street workout
    • Stainless steel outdoor
      • Stainless steel outdoor
      • Stainless machines
      • Outdoor gym
      • TRAINER OutdoorStart
      • TRAINER OutdoorFit
      • TRAINER sets
    • Fitness trail
      • Fitness trail
      • Accessible outdoor
      • TRAINER accessible
      • Wooden trail
    • Ninja Warrior
      • Ninja Warrior
      • Parkour
  • Playground
    • Rope play modules
      • Playground
      • Rope play modules
      • Rope play sets
      • Combined rope structures
      • Rope climbing pyramids
      • Rope climbing nets
      • Rope structure parts
    • Diamond Collection
      • Diamond Collection
      • Tubular play structures
      • Play towers
      • Elevated playhouses
      • Bespoke playgrounds
    • Swing sets
      • Swing sets
      • Spring riders
      • Playground roundabouts
      • Playground furniture
      • Kids outdoor fitness
  • Rubber flooring
    • Rubber flooring
      • Rubber flooring
      • Weightlifting tiles
      • Fire rated tiles
      • Coloured tiles
      • Wood effect tiles
      • COV A tiles
    • Outdoor flooring
      • Outdoor flooring
  • Street workout
  • Public sector
  • Case studies
  • Standards
  • Case studies
  • References
  • Standards
  • Warranties
  • After sales
  • Blog
  • FREN
  • Aucun produit dans le panier.
  • Home
  • Case studies: documented Light In Fitness projects
structure de jeu thematique chantier retro en corde pour aire de jeux – vue 5

Case studies: documented Light In Fitness projects

This page collects the projects for which every stage is traceable: order, manufacture, dispatch, delivery on site and commissioning. Each case study names the client, the exact location, the product installed and what actually happened, with no reconstruction. It complements our client references page, which lists 80 client organisations across seven categories. The distinction is simple: the references establish who has trusted us, the case studies set out how a project ran.

Documented projects

Client Location Category Equipment installed Year
Town of Taverny Square Georges-Vallerey, Taverny, Val d’Oise Municipality Interlocking outdoor sports flooring, extension of a first phase 2026
City of Rennes and Rennes Metropole Hautes-Ourmes district, Rennes, Brittany Metropolitan authority Bespoke Ninja Warrior rig and outdoor fitness trail stations, certified to EN 16630 2026
Municipality of Sallanches Sallanches, Haute-Savoie Municipality Double outdoor ninja warped wall, 3.90 m and 4.40 m, galvanised steel and stainless steel Published
Lycee Saint-Benigne Dijon, Cote d’Or School SP Max street workout rig, 11 m, four disciplines, for school sport Published
EPIDE centre Combree, Maine-et-Loire Employment integration SP Max rig, structure specified for intensive use Published
French Army Tahiti, French Polynesia Armed forces Ultimate street workout rig, operational physical preparation, overseas logistics Published
French Army, CFIM 6 Frejus, Var Armed forces Ultimate street workout rig for initial military training Published
French Army Carcassonne, Aude Armed forces Ultimate street workout rig, operational physical preparation Published
French Army, DICOM-GSB EFG Military logistics hub Armed forces Ultimate street workout rig, delivered through military supply channels Published
Multiple international clients Greece, Denmark (Velux), Poland, Singapore, Arizona International iGreenMill outdoor treadmill, installed on three continents Published
Multiple international clients 14 countries, from Polish thermal baths to Dubai, the Finnish army and resorts in Fuerteventura International Stainless steel functional rig Published
Various sectors France, from the Ministry of the Economy to Bonifacio hospital, franchise clubs and Saint-Tropez hotels Mixed Rubber gym flooring tiles and sports flooring deliveries Published

Further projects are being documented. A case study is only published once delivery on site is established by a dated document and the client does not object.

What a case study contains

  • The client and the site, named, with the municipality and the department or country.
  • The product actually installed, with a link to its catalogue page.
  • A dated sequence of events, from the initial enquiry to delivery on site.
  • Transferable lessons for a comparable project, including the points to watch.
  • The operating duties that apply after commissioning, such as inspection and record keeping.

We deliberately publish the awkward parts as well. On outdoor projects, the recurring points of difficulty are the same three every time: the ground survey and the anchoring depth available under the slab, the coordination between the flooring works and the rig installation, and the critical fall height required for the impact attenuating surface under the highest station. Getting those three wrong at design stage is what generates a variation order.

What the international projects show

Two product families account for most of our export work. The stainless steel functional rig has been installed in 14 countries, in environments as different as Polish thermal baths, hotel roofs in Dubai, Finnish army sites and resorts in Fuerteventura. Those are precisely the settings where 316L stainless steel earns its cost, because corrosion, not mechanical fatigue, is what ends the life of an open air structure. The iGreenMill outdoor treadmill has been installed on three continents, in Greece, Denmark, Poland, Singapore and Arizona, across a temperature range no single indoor specification covers.

The practical lesson for a buyer outside France is that export projects need three things settled before the order: the transport and customs basis, the anchoring method for the local slab or foundation, and the spare parts route. All three are priced per project rather than absorbed into a standard delivery rate.

What the defence projects show

Four of the documented projects are French Army sites, including one in Tahiti and one delivered through military logistics channels. Operational physical preparation loads a rig differently from a commercial gym: bodyweight work in large simultaneous groups, permanent rotation, and no tolerance for downtime. The specifications that follow from that are heavier section steel, bolt torque inspection on a quarterly cycle, and a documented spare parts channel from the outset. The same logic applies to fire services, prison services and employment integration centres such as the EPIDE site at Combree.

Finding a project close to yours

Entry point What it is for
Client references See the extract of organisations already equipped, grouped by category
Turnkey projects Understand how a complete project runs, from audit to installation
Public sector Procurement route, tender documentation and applicable standards
Standards and compliance The normative references to cite in a technical specification
Street workout rigs and Ninja Warrior rigs The product ranges behind most of the documented outdoor projects
Outdoor sports flooring Surfacing options, including impact attenuating tiles

Frequently asked questions

Why are so few case studies published compared with the number of clients?

Because a case study only goes online if delivery on site is established by a dated document and the client does not object. Many orders are delivered direct to the client by our suppliers, with no handover document in our archive, so they cannot be documented here.

Can we visit an installation before ordering?

This is a common request, particularly to judge the finish of a floor. Tell us your area and we will point you to the nearest accessible installation where one exists.

Do the case studies state contract values?

No. A client’s commercial terms are not published. The case studies describe the technical scope, the sequence of events and the lessons from the project.

How can our project appear on this page?

Clients who would like their project documented can tell us. The draft case study is submitted to them before publication.

Do you document international projects the same way?

Yes, with one difference: transport, customs and local anchoring conditions are recorded as part of the sequence, because those are the variables an overseas buyer needs to plan for. Our stainless steel and outdoor cardio ranges account for most of the export projects published.

Have your project priced

Tell us the type of facility, the floor area and your deadline, and we will send the pricing together with the corresponding standards references. Request a quote within 24 working hours, or browse the ranges on outdoor gym equipment and stainless steel outdoor fitness. Telephone +33 6 20 72 66 96.

HAUT
Ce site web utilise des cookies pour améliorer votre expérience. Nous supposons que vous êtes d'accord, mais vous pouvez vous désinscrire si vous le souhaitez. Paramètres des cookiesAccepter
Politique de confidentialité

Politique de confidentialité

Ce site web utilise des cookies pour améliorer votre expérience de navigation. Parmi ces cookies, ceux classés comme nécessaires sont stockés sur votre navigateur car ils sont essentiels au fonctionnement de base du site. Nous utilisons également des cookies tiers qui nous aident à analyser et comprendre comment vous utilisez ce site. Ces cookies ne seront stockés dans votre navigateur qu'avec votre consentement. Vous avez également la possibilité de désactiver ces cookies. Cependant, la désactivation de certains de ces cookies peut affecter votre expérience de navigation.
Nécessaires
Always Enabled
Les cookies nécessaires sont absolument essentiels au bon fonctionnement du site web. Cette catégorie ne comprend que les cookies qui assurent les fonctionnalités de base et les fonctions de sécurité du site. Ces cookies ne stockent aucune information personnelle.
Non nécessaires
Les cookies qui ne sont pas particulièrement nécessaires au fonctionnement du site et qui sont utilisés spécifiquement pour collecter des données personnelles via des analyses, des publicités ou d\'autres contenus intégrés sont qualifiés de cookies non nécessaires. Il est obligatoire d\'obtenir le consentement de l\'utilisateur avant d\'exécuter ces cookies sur votre site web.
SAVE & ACCEPT
Ma demande de devis 0