Description
C8 stainless steel outdoor workout station, 14 stations.
Configuration and technical checks
The C8 uses 316L stainless steel and combines 6 main stations with 8 additional activities. The advertised capacity of up to 22 users depends on the exercises and layout. Documentation gives working areas of 60 m² minimum and 77 m² recommended; these are not automatically the certified fall zones. Installation is included, transport is quoted separately, and foundations, flooring and optional accessories must be specified. Regular inspection and cleaning remain necessary.
Technical data
| Dimensions (L × W × H) | 900 × 320 × 310 cm |
|---|
Prepare the project
Send the site plan, available space, delivery address and access constraints. Specify the quantity and required installation services so the quotation covers the complete project.
Technical data sheet
| Length | 900 cm / 29’6’’ |
|---|---|
| Width | 320 cm / 10’6’’ |
| Height | 310 cm / 10’2’’ |
| Users working on the frame | 12 |
| Users around the frame | 10 |
| Minimum working area | 1000 cm × 600 cm / (32’9’’ × 19’8’’) |
| Perfect working area | 1100 cm × 700 cm / (36’1’’ × 22’1’’) |
| Material | Stainless steel 316L |
| Standard | EN 16630:2015-06E |
| Certificate | CE / EU Declaration of Conformity |
Manufacturer technical data checked by Light In Fitness. Layout plan and detailed data sheet on request.
Frequently asked questions
Which specification matters before ordering?
The C8 uses 316L stainless steel and combines 6 main stations with 8 additional activities. The advertised capacity of up to 22 users depends on the exercises and layout. Documentation gives working areas of 60 m² minimum and 77 m² recommended; these are not automatically the certified fall zones. Installation is included, transport is quoted separately, and foundations, flooring and optional accessories must be specified. Regular inspection and cleaning remain necessary.
What does the quotation include?
Ask for the exact supplied configuration, accessories and delivery arrangements. Transport, installation, lead time and warranty conditions must be specified for your project.





























