Description
The Ninja OCR Elite BIZON 3.3.3 cage combines three obstacle sections on eight extended-arm pillars for OCR gyms and physical preparation centres.
The catalogue lists a 12 × 3 m base and 15 × 4.2 m with extensions. These figures describe the structure, not the required safety area. The final footprint, moving obstacles, landing zones and circulation must be confirmed on the project plan.
Dimensions and components
| Base listed | 12 × 3 m |
|---|---|
| With extensions | 15 × 4.2 m — confirm configuration |
| Heights listed | Base pillars 2.70 m; rope and fireman-pole equipment 4 m |
| Pillar section | 70 × 70 × 3 mm |
| Materials | Metal with powder coating; timber, reinforced plywood, polypropylene ropes and composite grips |
| Price | 22,000 EUR excluding VAT |
| Production lead time | 30 to 60 days, confirmed in the quotation |
| Warranty shown | 24 months on the frame and 12 months on obstacles; confirm quotation conditions |
Obstacle configuration
The catalogue includes a salmon ladder, hamster and rotating grip obstacles, pegboard rails, rings, Ninja Sticks, grip boards, ropes and a climbing pole across three sections. The final supply list and the height of each section are confirmed with the quotation.
Installation and documents
Provide a measured plan, clear height, subfloor photos, proposed users and operating arrangements. Obtain the anchoring plan, load limits and installation instructions for the selected configuration. Outdoor use and corrosion protection must be confirmed for the site. The model code 3.3.3 does not denote a three-metre cube. Training for Ninja or OCR events does not establish official competition approval.
Frequently asked questions
How much space is needed?
Start with the catalogue footprint, then add the obstacle movement, landing areas, circulation and maintenance access defined on the project plan.
What clear height is needed?
The catalogue gives 2.70 m base pillars and 4 m for rope and pole equipment. Allow for users and movements above and around the obstacles, then confirm the clearances on the final installation plan.



















