Description
The Climbing Station BLO-077 is an outdoor climbing frame and stall-bar structure from the GardenFit range. Combining vertical uprights with ergonomic horizontal rungs over several levels, it supports controlled climbing, stretching and bodyweight strengthening — a natural centrepiece for school grounds, parks and progressive fitness trails.
Key features
- High-strength galvanised steel structure with anti-corrosion, anti-UV epoxy powder finish
- Multi-level rung layout allowing users to progress from low holds to full-height climbs
- Designed to meet the safety requirements applicable to outdoor fitness equipment
- Ground-anchored installation, with a turnkey fitting service on quotation
- Specified by local authorities, schools, residential schemes and sports centres
Climbing as functional training
Controlled climbing recruits the grip, shoulders, core and legs in one coordinated effort, which is why climbing frames remain a staple of physical education and military-style conditioning. On the BLO-077, users can also anchor a foot or hand at any level for deep stretching, hang from the upper rungs for spinal decompression, or perform incline push-ups and rows from the lower ones. One structure covers strength, mobility and coordination.
Specifications
| Reference | FIT-04917 |
|---|---|
| Frame | Hot-dip galvanised steel, epoxy powder coated |
| Configuration | Multi-level climbing frame with horizontal ergonomic rungs |
| Intended use | Parks, schools, residential schemes, sports centres |
| Installation | Ground-anchored; installation service on quotation |
| Price | On request — project quotation within 24 business hours |
Frequently asked questions
How does it differ from the Double Wall Bar BLO-073?
The BLO-077 is built as a climbing structure with a multi-level layout for ascent and traverse work, whereas the wall bar is primarily a stretching and mobility frame. Many circuits include both.
Is it suitable for beginners?
Yes. The lower rungs allow supported stretches and partial climbs, so users progress at their own pace before attempting full-height movements.
What surfacing is required beneath it?
Surfacing depends on the site and layout; requirements are confirmed with the siting documentation supplied at project stage.
Plan your project
Our team prepares layouts, technical files and budgets for complete outdoor areas. Request a quotation — response within 24 business hours.









