Skip to content

Fire rated rubber flooring tiles

Fire rated rubber flooring tiles: our professional selection

Repères de gamme — 7 modèles, dont 7 à prix affiché : 42 €–64 € HT par appareil (calcul du 30/09/2026).

Fire rated rubber tiles answer the requirements of sports venues open to the public, strength training areas, hotels, local authority buildings and professional centres where the floor covering has to satisfy a reaction to fire classification. Light In Fitness helps you choose a covering that combines impact absorption, durability and the safety classification your building requires.

What defines our sports flooring

Thicknesses and formatsFrom 6 to 60 mm, up to 100 mm for extreme use. Formats 50 × 50, 50 × 100 and 100 × 100 cm, plus mats and rolls
Density900 to 1,000 kg/m³ depending on the reference, stated on every product page
CompositionRecycled rubber granules with polyurethane binder; coloured, wood-effect or patterned versions depending on the range
Impact attenuationCritical fall height validated by HIC testing to EN 1177, published reference by reference
Fire classificationThree classifications backed by test reports (EN 13501-1): Bfl-s1 by SGS (SBR/EPDM tiles 15 to 40 mm), Cfl-s1 by LNE (SBR tiles 15 to 30 mm) and Dfl-s1 by LNE (SBR tiles with EPDM top layer, 25 to 30 mm); reports available on request, not published online; other thicknesses and finishes are classified by Light In Fitness declaration on these bases
AcousticsΔLw values declared by Light In Fitness on the basis of supplier testing, attestation on request
InstallationLoose-laid, connector-jointed or bonded depending on thickness and use. Substrate, flatness and drainage to be checked before ordering
Edge detailingFinishing profiles for 20, 25 and 40 mm thicknesses, plus a sloped transition strip. Access ramps and made-to-measure edging available as an option, quoted with the layout
Available on requestCellular tiles to be filled with gravel or topsoil, made-to-measure edging and ramps, interlocking rubber pavers for stables and technical rooms
Choosing the thicknessBy use zone — free weights, cardio, functional training, play area — never by overall floor area

Showing all 7 resultsSorted by latest

Understanding the Bfl, Cfl and Dfl classes

These are the European reaction to fire classifications applicable to floor coverings, listed here from the highest performing to the lowest of the three. Which class a project needs is set by the building, its use and its classification as a venue open to the public, not by the equipment installed on the floor. The correct order of operations is to obtain the required class from the building file, then specify the covering, because retrofitting a compliant floor after an inspection is far more expensive.

Class Relative performance Typical context
Bfl Highest of the three Venues with the strictest requirements
Cfl Intermediate Many public sports and hotel areas
Dfl Lowest of the three Where no higher class is imposed

Specification, laying and documentation

Ask for the classification certificate with the quotation and keep it in the building file, since that is the document an inspection will ask for. Beyond the fire class, the covering is specified like any other: thickness follows the impact to be absorbed and the traffic it will carry. Laying is loose on a flat, stable sub floor in most indoor cases, bonded where rolling loads or slopes apply. For the wider range see rubber gym flooring tiles.

Frequently asked questions

How do I know which class my building requires?

The requirement comes from the building’s classification and its fire safety file, prepared by the party responsible for the works or by the operator, not from the flooring supplier. Once the class is known, we supply a covering that meets it together with the supporting certificate. If the class is not yet fixed, ask the question before ordering.

Does a fire classification reduce impact absorption?

Not inherently. Fire performance and impact absorption are separate properties, and both appear on the technical sheet. What matters is checking that the reference chosen satisfies both requirements at the same time rather than one of them. We confirm both figures on the offer.

Send us the required class, the surface area and the intended activity, and we will return a compliant specification. Request a quotation for a reply within 24 working hours.

TOP
My quotation request 0